Heating, ventilation, air conditioning and refrigeration engineering technicians aid in the design of devices which provide heating, ventilation, air conditioning and possibly refrigeration in buildings. They ensure the equipment complies with environmental standards. They handle hazardous materials used in the systems, and ensure safety precautions are in place.

3115.1.5 ISCO 3115 ESCO source
Competences
40
Groups
4
Essential
18
Optional
22

Competences and skills

40 ESCO relations
Essential knowledge 8 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

4 competences
domestic cooling systems

The modern and traditional cooling systems such as air conditioning, ventilation, or radiant cooling, and their energy saving principles.

ESCO source
electric heating systems

Electric heating systems contribute to indoor comfort and energy saving under the right conditions (low frequency use, or very highly insulated buildings). They include InfraRed and electric floor/wall heating.

green
ESCO source
mechanical engineering

Discipline that applies principles of physics, engineering and materials science to design, analyse, manufacture and maintain mechanical systems.

ESCO source
types of heat pumps

Various types of heat pumps, used to produce heating, cooling and potable hot water making use of an energy source with low temperature and bringing it to a higher temperature.

green
ESCO source

Cross-sector

4 competences
heating, ventilation, air conditioning and refrigeration parts

The different parts constituing heating, air conditioning and refrigeration systems such as the different valves, fans, compressors, condensers, filters and other components.

ESCO source
hydraulics

The power transmission systems that use the force of flowing liquids to transmit power.

ESCO source
refrigerants

The characteristics and properties of the different fluids used in heat pump and refrigeration cycles.

ESCO source
thermodynamics

The branch of physics that deals with the relationships between heat and other forms of energy.

ESCO source
Essential skills and competences 10 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

3 competences
interpret 2D plans

Interpret and understand plans and drawings in manufacturing processes which include representations in two dimensions.

ESCO source
monitor utility equipment

Monitor equipment which provides utility services such as power, heat, refrigeration, and steam, in order to ensure they are functional, operate according to regulations, and to check for faults.

ESCO source
operate climate control

Operate climate control installations.

ESCO source

Cross-sector

7 competences
apply health and safety standards

Adhere to standards of hygiene and safety established by respective authorities.

ESCO source
conduct routine machinery checks

Check machinery and equipment to ensure reliable performance during use and operations in worksites.

ESCO source
ensure compliance with environmental legislation

Monitor activities and perform tasks ensuring compliance with standards involving environmental protection and sustainability, and amend activities in the case of changes in environmental legislation. Ensure that the processes are compliant with environment regulations and best practices.

green
ESCO source
handle refrigerant transfer pumps

Handle the different transfer pumps used to keep a refrigerant in the liquid phase at the right pressure for an optimal accuracy and speed of the charging station.

ESCO source
interpret 3D plans

Interpret and understand plans and drawings in manufacturing processes which include representations in three dimensions.

ESCO source
maintain records of maintenance interventions

Keep written records of all repairs and maintenance interventions undertaken, including information on the parts and materials used, etc.

ESCO source
use testing equipment

Use equipment to test performance and operation of machinery.

ESCO source
Optional knowledge 2 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

2 competences
biogas energy

Energy production for heating and potable hot water making use of biogas (the biogas is generated off-site), and its contribution to energy performance.

green
ESCO source
district heating and cooling

District heating and cooling exploits local sustainable sources of energy to provide heating and potable hot water to a group of buildings and contributes to improve the energy performance.

green
ESCO source

Cross-sector

0 competences

No competences in this bucket.

Optional skills and competences 20 competences

Occupation specific

4 competences
install firestops

Attach fire resistant collars or material to pipes and ducts to prevent the spread of fire and smoke through wall or ceiling openings.

ESCO source
install refrigeration equipment

Install refrigeration, air condition or heat pump equipment, connect components and piping, attach equipment to the electrical network and secondary sources of heat transfer if required.

ESCO source
perform refrigerant leak checks

Perform refrigerant leak checks of refrigeration, air condition or heat pump equipment to make sure there are no leaks of refrigerant from the system using both direct and indirect method.

ESCO source
test tightness and pressure of refrigeration circuits

Perform system pressure tests on refrigeration, air condition or heat pump equipment using pressurised gas and vacuum pump to check tightness of the refrigeration circuit and its parts.

green
ESCO source

Sector-specific

4 competences
advise on fitted ventilation systems

Investigate and advise on a ventilation system that fits the energy demands but also guarantees good indoor air quality according to minimum indoor air quality levels. Consider alternative ways of ventilation (e.g., stack ventilation, use of chimney effect, natural ventilation).

green
ESCO source
arrange equipment repairs

Arrange for equipment repairs when necessary.

ESCO source
drain hazardous liquids

Drain substances which pose health and safety risks from equipment, appliances or installations in order to store the liquids according to safety guidelines and dispose or treat them as required.

green
ESCO source
provide power connection from bus bars

Provide power connection from copper or metal busbars.

ESCO source

Cross-sector

12 competences
examine engineering principles

Analyse the principles that need to be considered for engineering designs and projects such as functionality, replicability, costs and other principles.

ESCO source
install air conditioning device

Install air conditioning devices, which remove heat, and often moisture, from the air through a variety of mechanisms. Create the necessary openings through walls and floors and place the device. Connect it to a power supply. Configure the device.

ESCO source
install electrical and electronic equipment

Install equipment which is dependent on electric currents or electromagnetic fields in order to work, or equipment to generate, transfer or measure such currents and fields. This equipment includes switchboards, electric motors, generators or direct current systems.

ESCO source
install heating boiler

Place heating, ventilation, air conditioning and refrigeration boilers, which heats up water and circulates it through a closed radiator system to distribute heat around a structure. Connect the boiler to a source of fuel or electricity and to the circulation system. Connect it to the water supply if it features an automatic filling system. Configure the boiler.

ESCO source
install heating furnace

Place a furnace which heats air to be distributed around a structure. Connect the furnace to a source of fuel or electricity and connect any air ducts to guide the heated air. Configure the furnace.

ESCO source
install heating, ventilation, air conditioning and refrigeration ducts

Install ducts to deliver and remove air. Determine whether the duct should be flexible or not, and select the appropriate material based on projected usage. Waterproof and airproof the duct and insulate it against temperature influence to ensure maximum efficiency and prevent contamination with mould. Make the correct connections between the ducts and endpoints.

ESCO source
install ventilation equipment

Install equipment to enable the ventilation of a structure. Mount fans and install air inlets and outlets. Install ducts to permit the transfer of air. Configure the ventilation system if it is electronically controlled.

ESCO source
lay pipe installation

Install the system of pipes used to transport a fluid, be it a liquid or a gas, from one point to another and connect it to the fuel and water supply lines, air ducts, and other components.

ESCO source
lead a team

Lead, supervise and motivate a group of people, in order to meet the expected results within a given timeline and with the foreseen resources in mind.

ESCO source
perform maintenance on installed equipment

Perform the maintenance on installed equipment on-site. Follow procedures to avoid uninstalling equipment from machinery or vehicles.

ESCO source
resolve equipment malfunctions

Identify, report and repair equipment damage and malfunctions. Communicate with field representatives and manufacturers to obtain repair and replacement components.

ESCO source
use personal protection equipment

Make use of protection equipment according to training, instruction and manuals. Inspect the equipment and use it consistently.

ESCO source