Skip to content
ESCO occupation

waterway construction labourer

Back to ESCO occupations

Waterway construction labourers maintain canals, dams and other waterway structures such as coastal or inland water plants. They are responsible for the construction of breakwaters, canals, dikes and embankments as well as other works in and around water.

9312.1.6 ISCO 9312 ESCO source
Competences
47
Groups
4
Essential
23
Optional
24

Competences and skills

47 ESCO relations
Essential knowledge 6 competences

Occupation specific

1 competence
types of waterways

Field of information which distinguishes different types of man-made waterways such as canals and dams.

ESCO source

Sector-specific

3 competences
dredging consoles

The configuration of different types of dredging consoles. How the functions of the dredge are mapped to the console.

ESCO source
excavation techniques

The methods to remove rock and soil, used in an excavation site and the associated risks.

ESCO source
national waterways

The national waterways used for inland navigation. The geographical location of rivers, canals, seaports and inland harbours, and their relationship with cargo flows.

ESCO source

Cross-sector

2 competences
water policies

The framework of policies, strategies, institutions, and regulations concerning water.

green
ESCO source
water pressure

Physical laws, qualities and applications of liquid or water pressure.

ESCO source
Essential skills and competences 17 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

12 competences
construct canal locks

Install lock systems in sections of canals for the raising and lowering of vessels from one level to another. These are used for their passage over canals as well as for the control of the water level.

ESCO source
construct dams

Dewater a suitable area through the construction of a diversion tunnel and use earthmoving equipment to build a coffer dam. Remove rocks and rubble in order to construct a plant, which uses concrete to prevent water leakages by using waterstops.

ESCO source
dig soil mechanically

Use mechanical equipment to dig up and move soil. Form pits according to excavation plans.

ESCO source
inspect concrete structures

Visually inspect a concrete structure to see if it is structurally sound. Check for different types of cracks, such as those due to reinforcement corrosion, impact damage or high water content.

ESCO source
inspect construction sites

Ensure health and safety during the construction project by inspecting the construction site regularly. Identify risks of putting people in danger or of damaging construction equipment.

ESCO source
install tunnel segments

Set the reinforced concrete tunnel segments in place after the tunnel boring machine has excavated sufficient space. Base the position of the segments on the plans or calculations for optimal placement.

ESCO source
maintain dredging equipment

Keep the dredging equipment in good condition. Regularly inspect suction elements, pumps, cables, cutterheads and other elements and take the necessary steps to repair any damage or wear.

ESCO source
manage sumps

Oversee correct operation of sumps; to make sure that the operations for collecting and removing the undesirable or excess liquid runs smoothly.

ESCO source
operate sumps

Operate industrial sumps used to remove excess liquid such as water or chemicals.

ESCO source
plan surface slope

Make sure the planned surface has the necessary slope to prevent puddling of water or fluids.

ESCO source
use rigging equipment

Set up rolling and lifting equipment required to lift and move objects e.g. with a crane or block and tackle system.

ESCO source
work in a construction team

Work as part of a team in a construction project. Communicate efficiently, sharing information with team members and reporting to supervisors. Follow instructions and adapt to changes in a flexible manner.

ESCO source

Cross-sector

5 competences
follow health and safety procedures in construction

Apply the relevant health and safety procedures in construction in order to prevent accidents, pollution and other risks.

green
ESCO source
identify defects in concrete

Use infrared techniques to discover defects in concrete.

ESCO source
measure water depth

Measure the depths of a body of water by using depth measuring equipment such as a depth gauge.

ESCO source
operate pumps

Operate industrial pumps used to remove excess liquid.

ESCO source
perform drainage work

Dig draining ditches and lay the pipe or gutter installation to allow evacuation of surplus liquid and avoid subsidence or other damage.

ESCO source
Optional knowledge 6 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

3 competences
demolition techniques

Various methods of demolishing structures, like controlled implosion, use of a wrecking ball or jackhammer, or selective demolition. Usage cases of these methods based on type of structure, time constraints, environment and expertise.

ESCO source
european classification of inland waterways

The European classification of inland waterways and the related regulatory framework.

ESCO source
international waterways

The international waterways used for maritime navigation, the geographical location of currents, maritime waterways, and harbours.

ESCO source

Cross-sector

3 competences
flood remediation equipment

The operation of the necessary tools and equipment used in flood damage and remediation activities, such as pumping flooded properties.

ESCO source
quality assurance procedures

The procedures to inspect a product or system to ensure that it is according to specifications and requirements.

ESCO source
water reuse

Principles of water re-use processes in complex circulation systems.

green
ESCO source
Optional skills and competences 18 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

14 competences
check borehole depth

Check the depth of boreholes; make sure that they are clean.

ESCO source
conduct erosion control

Manage erosion control processes and projects. Plan erosion control actions to control or prevent erosion from occurring and avoid water pollution or soil loss.

green
ESCO source
conduct sediment control

Manage sediment control processes and projects. Plan sediment control actions to prevent eroded soil from polluting nearby waterways.

green
Scope note
Sediment control techniques are mostly used together with erosion control techniques. Used on construction sites.
ESCO source
design dams

Envision and design dams considering calculations, project purpose, and budget.

ESCO source
insert charges into drill holes

Transport explosives and safely load explosives into drill holes.

ESCO source
inspect drainage channels

Maintain and clear gutters, sewer systems, and other water carrying facilities to ensure proper drainage and prevent damage to infrastructure such as roads and railways.

ESCO source
inspect pipelines

Walk flow lines to identify damage or leaks; use electronic detection equipment and conduct visual inspections.

ESCO source
mix construction grouts

Mix construction materials with water and other materials based on the appropriate recipe. Mix thoroughly to prevent lumps. Avoid contamination, which will adversely affect the properties of the mixture.

ESCO source
operate drilling equipment

Operate a range of drilling equipment, pneumatic as well as electrical and mechanical. Tend drilling equipment, monitor and operate it, according to regulations. Safely and efficiently drill holes using the correct equipment, settings, and drill bits.

ESCO source
operate vacuum dewatering system

Operate a vacuum dewatering system which applies a vacuum to material in order to remove excess liquid.

ESCO source
perform underwater bridge inspection

Wade through a body of water to inspect the piles of a bridge. Put on the appropriate equipment, such as weights, and make sure to have an associate present for safety reasons.

ESCO source
position dredger

Communicate with the captain or mate to move the dredge into the right position to commence the dredging operation.

ESCO source
pour concrete underwater

Prepare the construction pit and guide the pipeline used to place the concrete mix underwater in a process called tremie. Ensure a continuous flow of concrete to avoid water going up the pipeline.

ESCO source
set up temporary construction site infrastructure

Set up a variety of temporary infrastructure used on building sites. Put up fences and signs. Set up any construction trailers and make sure that these are connected to electricity lines and water supply. Establish supplies stores and garbage disposal in a sensible manner.

ESCO source

Cross-sector

4 competences
develop flood remediation strategies

Develop plans and design equipment for the prevention of floods and efficient aid in the event of a flood, by assessing the risks, identifying improvements in existing strategies, and designing new strategies in flood remediation.

green
ESCO source
identify risk of flooding

Identify the areas which are most at risk to be damaged by floods, such as areas close to rivers, as well as identifying the events which would cause floods such as changes in the weather.

ESCO source
operate cranes

Operate cranes to move, position, lift or place machinery, equipment or other large objects at various locations.

ESCO source
read standard blueprints

Read and comprehend standard blueprints, machine, and process drawings.

ESCO source