Skip to content
ESCO occupation

bridge construction supervisor

Back to ESCO occupations

Bridge construction supervisors monitor the construction of bridges. They assign tasks and take quick decisions to resolve problems.

3123.1.2 ISCO 3123 ESCO source
Competences
55
Groups
4
Essential
28
Optional
27

Competences and skills

55 ESCO relations
Essential knowledge 1 competence

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

0 competences

No competences in this bucket.

Cross-sector

1 competence
mechanical tools

Various type of machines and tools, including their designs, uses, repair, and maintenance.

ESCO source
Essential skills and competences 27 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

8 competences
check compatibility of materials

Make sure the materials are fit to be used together, and if there are any foreseeable interferences.

ESCO source
identify external risks to bridge integrity

Inspect the area of the bridge to identify any possible external risk to its integrity. Make sure body of waters present no dangerous debris. Identify loose rocks or avalanche risks. Estimate whether usage strain on a bridge is within the limits.

ESCO source
interpret 2D plans

Interpret and understand plans and drawings in manufacturing processes which include representations in two dimensions.

ESCO source
keep records of bridge investigation findings

Register the results of bridge investigations and send them to the appropriate authorities.

ESCO source
manage bridge construction projects

Inspect, assess and approve technical procedures; apply maintenance strategies, systems and procedures; assess the load testing of bridges; devise new methods of strengthening; and ensure the suitable design of bridges taking into consideration issues such as durability, maintenance requirements etc.

ESCO source
monitor stock level

Evaluate how much stock is used and determine what should be ordered.

ESCO source
process incoming construction supplies

Receive incoming construction supplies, handle the transaction and enter the supplies into any internal administration system.

ESCO source
work in a construction team

Work as part of a team in a construction project. Communicate efficiently, sharing information with team members and reporting to supervisors. Follow instructions and adapt to changes in a flexible manner.

ESCO source

Cross-sector

19 competences
conduct quality control analysis

Conduct inspections and tests of services, processes, or products to evaluate quality.

ESCO source
coordinate construction activities

Coordinate the activities of several construction workers or crews to make sure they do not interfere with each other and to ensure that the works are done in a timely manner. Keep up to date on the progress of the teams and update the schedule if called for.

ESCO source
ensure compliance with construction project deadline

Plan, schedule and monitor the building processes in order to ensure completion of the project by the set deadline.

ESCO source
ensure equipment availability

Ensure that the necessary equipment is provided, ready and available for use before start of procedures.

ESCO source
evaluate employees work

Evaluate the need for labour for the work ahead. Evaluate the performance of the team of workers and inform superiors. Encourage and support the employees in learning, teach them techniques and check the application to ensure product quality and labour productivity.

ESCO source
follow health and safety procedures in construction

Apply the relevant health and safety procedures in construction in order to prevent accidents, pollution and other risks.

green
ESCO source
identify defects in concrete

Use infrared techniques to discover defects in concrete.

ESCO source
inspect construction supplies

Check construction supplies for damage, moisture, loss or other problems before using the material.

ESCO source
interpret 3D plans

Interpret and understand plans and drawings in manufacturing processes which include representations in three dimensions.

ESCO source
keep records of work progress

Maintain records of the progress of the work including time, defects, malfunctions, etc.

ESCO source
liaise with managers

Liaise with managers of other departments ensuring effective service and communication, i.e. sales, planning, purchasing, trading, distribution and technical.

ESCO source
manage health and safety standards

Oversee all personnel and processes to comply with health, safety and hygiene standards. Communicate and support alignment of these requirements with the company's health and safety programmes.

ESCO source
plan resource allocation

Plan future needs of various resources such as time, money and specific process resources.

ESCO source
plan shifts of employees

Plans shifts of employees to ensure completion of all customer orders and satisfactory completion of the production plan.

ESCO source
prevent damage to utility infrastructure

Consult utility companies or plans on the location of any utility infrastructure that may interfere with a project or be damaged by it. Take the necessary steps to avoid damage.

ESCO source
react to events in time-critical environments

Monitor the situation around you and anticipate. Be ready to take quick and appropriate action in case of unexpected events.

ESCO source
secure working area

Secure the operation site fixing boundaries, restricting access, placing signs and taking other measures in order to guarantee public and staff safety.

ESCO source
supervise staff

Oversee the selection, training, performance and motivation of staff.

ESCO source
use safety equipment in construction

Use elements of protective clothing such as steel-tipped shoes, and gear such as protective goggles, in order to minimise risk of accidents in construction and to mitigate any injury if an accident does occur.

ESCO source
Optional knowledge 8 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

4 competences
bridge engineering

Thoroughly understand principles and characteristics of bridge management, bridge deck loading, bridge durability, steel and composite bridge design, long span bridges, etc.

ESCO source
construction product regulation

Regulations on construction products quality standards applied throughout the European Union.

ESCO source
cost management

The process of planning, monitoring and adjusting the expenses and revenues of a business in order to achieve cost efficiency and capability.

ESCO source
crane load charts

Crane load charts detail the features of the crane and how its lift capacity varies depending on distance and angle.

ESCO source

Cross-sector

4 competences
machinery load capacity

The maximum load capacity of the operated piece of machinery, under different circumstances and in different positions and movements. Passive load capacity and active load capacity, which is measure while in motion.

ESCO source
types of asphalt coverings

Different types of asphalt covering, based on their bitumen content and composition. The strengths, weaknesses, and price points of each type. Special properties such as porosity, resistance to skidding and noise characteristics.

ESCO source
types of wood

Types of wood, such as birch, pine, poplar, mahogany, maple and tulipwood.

green
ESCO source
wood cuts

Different ways of cutting wood, across the grain or parallel with it, and radial or tangential to the core. The behaviour of cuts of wood under different circumstances and the optimal cut for a given purpose. Influence of special attributes of the wood, like knots or defects.

ESCO source
Optional skills and competences 19 competences

Occupation specific

0 competences

No competences in this bucket.

Sector-specific

5 competences
estimate restoration costs

Estimate the cost implications of restoring and replacing products or parts.

ESCO source
guide operation of heavy construction equipment

Guide a colleague in operating a piece of heavy construction equipment. Follow the operation closely and understand when feedback is called for. Use communication techniques like voice, two-way radio, agreed-upon gestures and whistles to signal the appropriate information to the operator.

ESCO source
identify wood warp

Identify wood that has changed shape due to stresses, wear or incorrect installation. Recognise the different types of warp, like bow, twist, crook and cup. Identify possible causes and solutions to wood warp.

ESCO source
inspect construction sites

Ensure health and safety during the construction project by inspecting the construction site regularly. Identify risks of putting people in danger or of damaging construction equipment.

ESCO source
transport construction supplies

Bring construction materials, tools and equipment to the construction site and store them properly taking various aspects into account such as the workers' safety and protection from deterioration.

ESCO source

Cross-sector

14 competences
advise on construction materials

Provide advice on and test a wide range of construction materials.

Scope note
It includes building stone, sand, bricks, clay and gravel.
ESCO source
answer requests for quotation

Make up prices and documents for the products that customers may purchase.

ESCO source
calculate needs for construction supplies

Take measurements on site and estimate the amount of materials required for the construction or restoration project.

ESCO source
drive mobile heavy construction equipment

Drive movable heavy equipment used in construction. Load the equipment onto low loaders, or unload it. Judiciously drive equipment on public roads when required.

ESCO source
follow safety procedures when working at heights

Take necessary precautions and follow a set of measures that assess, prevent and tackle risks when working at a high distance from the ground. Prevent endangering people working under these structures and avoid falls from ladders, mobile scaffolding, fixed working bridges, single person lifts etc. since they may cause fatalities or major injuries.

ESCO source
order construction supplies

Order required materials for the construction project, taking care to purchase the most suitable material for a good price.

ESCO source
provide first aid

Administer cardiopulmonary resuscitation or first aid in order to provide help to a sick or injured person until they receive more complete medical treatment.

ESCO source
provide technical expertise

Provide expert knowledge in a particular field, especially concerning mechanical or scientific subjects, to decision makers, engineers, technical staff or journalists.

ESCO source
recognise signs of wood rot

Check whether a wood element shows signs of rot. Aurally inspect the wood by testing what sound it makes on impact. Check for visual signs of rot.

ESCO source
recruit employees

Hire new employees by scoping the job role, advertising, performing interviews and selecting staff in line with company policy and legislation.

Scope note
It may include recruiting volunteers.
ESCO source
report defective manufacturing materials

Maintain required company records and forms in order to report any defective materials or questionable conditions of manufacturing machinery and equipment.

ESCO source
train employees

Lead and guide employees through a process in which they are taught the necessary skills for the perspective job. Organise activities aimed at introducing the work and systems or improving the performance of individuals and groups in organisational settings.

ESCO source
use measurement instruments

Use different measurement instruments depending on the property to be measured. Utilise various instruments to measure length, area, volume, speed, energy, force, and others.

ESCO source
work ergonomically

Apply ergonomy principles in the organisation of the workplace while manually handling equipment and materials.

ESCO source