project commissioning
Process of supervising the correct functioning of systems, buildings or plants during the final stages before deployment.
Commissioning engineers supervise the final stages of a project when systems are installed and tested. They inspect the correct functioning of the equipment, facilities and plants to make sure they meet the requirements and specifications. They perform the necessary verifications and give approval to finalise the project.
No competences in this bucket.
Process of supervising the correct functioning of systems, buildings or plants during the final stages before deployment.
The procedures to inspect a product or system to ensure that it is according to specifications and requirements.
The national and international requirements, specifications and guidelines to ensure that products, services and processes are of good quality and fit for purpose.
The study of the risks associated with engineered designs and systems, accident prevention as well as the safety benefits of reducing deaths and injuries. The discipline focuses on analysing and mitigating potential hazards in engineering processes.
No competences in this bucket.
Implement the relevant procedures, strategies and use the proper equipment to promote local or national security activities for the protection of data, people, institutions, and property.
Analyse the performance of power plants by operating the plant at maximum output for a predetermined period of time so guaranteed performance can be established and legal quality requirements can be verified.
Interpret and analyse data collected during testing in order to formulate conclusions, new insights or solutions.
Make sure that the measurable factors which define the operation of a system correspond to the predetermined norms.
Work closely and communicate with engineers on designs or new products.
Conduct inspections and tests of services, processes, or products to evaluate quality.
Ensure that the assembled products are conform to the specifications given.
Ensure that all legal requirements are met.
Work closely with the relevant quality assurance or grading party involved.
Display results, statistics and conclusions to an audience in a transparent and straightforward way.
Read and comprehend standard blueprints, machine, and process drawings.
Record data which has been identified specifically during preceding tests in order to verify that outputs of the test produce specific results or to review the reaction of the subject under exceptional or unusual input.
Identify operating problems, decide what to do about it and report accordingly.
Use different measurement instruments depending on the property to be measured. Utilise various instruments to measure length, area, volume, speed, energy, force, and others.
Use equipment to test performance and operation of machinery.
Compose work-related reports that support effective relationship management and a high standard of documentation and record keeping. Write and present results and conclusions in a clear and intelligible way so they are comprehensible to a non-expert audience.
No competences in this bucket.
The different steps in the production of electricity using fossil fuels and the function of all the components of the required equipment such as boilers, turbines and generators.
The different steps in the production of electricity from geothermal energy and the function of all the components of the required equipment such as pumps, compressors, heat exchangers and turbines.
The equipment and instruments used for the monitoring and controlling processes in power plants. This requires proper operation, calibration, and regular maintenance.
The discipline of project management, the activities which comprise this area and the variables implied in it, such as time, resources, requirements, deadlines, and responding to unexpected events.
Those processes in which hardware components or systems are tested, such as the system test (ST), the ongoing reliability test (ORT), and the in-circuit test (ICT).
The generation of electrical energy through the use of nuclear reactors, by converting the energy released from nuclei of atoms in reactors which generate heat. This heat subsequently generates steam which can power a steam turbine to generate electricity.
The methods for producing results in science or engineering, such as physical tests, chemical tests, or statistical tests.
No competences in this bucket.
Comply with nuclear power plant safety procedures, policies and legislation to ensure a safe working environment for all employees, and to ensure the safety of the public.
Repair and perform routine maintenance on equipment which controls nuclear chain reactions to generate electricity, ensure that the equipment functions safely and compliant with legislation.
Control nuclear plant systems, such as ventilation and water draining systems, to ensure proper functioning and identify irregularities.
Manage and plan various resources, such as human resources, budget, deadline, results, and quality necessary for a specific project, and monitor the project's progress in order to achieve a specific goal within a set time and budget.
Test the composition, characteristics, and use of materials in order to create new products and applications. Test them under normal and extraordinary conditions.
Test sensors using appropriate equipment. Gather and analyse data. Monitor and evaluate system performance and take action if needed.